Digital Sofa · Stories
Flagship Milano
Digital Sofa’s Contract division is fitting out a store in Milan. It’s 9 am on Monday. Seven packages of fittings are ready and transport is booked. One screen is still waiting for electrical sign-off. Project manager Elisa Neri must decide which work can go ahead before the store opens on Friday.

Before the brief · Proposed extension
The story could begin with Marta emailing Giulia Ferretti about the store, its opening date and the fittings it needs. Before quoting, Giulia checks feasibility with Elena, factory lead times with Luca and the schedule with Elisa. She sends Marta the offer and gives Elisa the agreed scope, dates and contacts.
The emails and quotation are a proposed addition to the story. The project file opens with the signed brief.
Who supplies the screens?
Elisa Neri and Marta Costa sign the brief for unit M01. Digital Sofa’s Contract division designs, makes and installs the checkout counter, display wall, wall units and mounts for two screens. Marta commits the brand to supplying the screens and their content. Site management provides access and power. With those responsibilities agreed, Elisa can send the design team to survey the store.
The signed brief, FM-001-BRF, sets the scope and calls for a joint inspection before the brand takes possession.
Profiles
A cable runs behind the display wall
Designer Elena Riva and site supervisor Riccardo Leone measure the finished opening. The display wall has 3,600 mm of clear width, but the proposed cable route for the second screen, D2, takes it behind the panel. Riccardo also checks the route from the loading bay. Elena transfers the measurements to the drawing, using the wall’s left edge as the reference for D2.
Site survey FM-001-RIL records the dimensions, access route and cable conflict. The dimensioned plan, FM-001-SCV, shows the survey measurements alongside the position approved in revision B.
Profiles
Revision B gives the team access to D2
In revision A, the cable would sit behind a closed wall. Elena moves D2 150 mm to the right and adds a 220 × 300 mm rear access panel. Marta approves revision B and the finish samples. Luca can now order materials against that drawing. If a change comes in later, Elisa has the team assess its impact before issuing another revision.
Drawing record FM-001-EXE keeps both revisions. Revision B supersedes A for production and installation. FM-001-FIN identifies the samples Marta approved.
Seven packages cleared for dispatch
Luca Bernardi confirms the materials and puts batch FM-L01 into production against revision B. Before packing, Luca and quality inspector Paolo Ferri fit the two wall sections together, compare the finishes with the samples and check that the D2 panel opens. Paolo signs the release. Sara Romano confirms the delivery slot with the carrier and gives Riccardo the time and the list of seven packages.
Order FM-001-ORD cites revision B. Paolo signs the factory inspection record, FM-001-FAC. The carrier booking is confirmed in FM-001-TRC.
The fittings can go in. D2 still needs a signature.
By 9 am on Monday, Giorgio Sala has signed off site access. Elisa can keep the delivery and mechanical installation on the schedule. The shipment is due on Tuesday between 8 and 10 am. Sara will work with the site team to check quantities and damage, then Riccardo can have the fittings secured. D2 needs a separate clearance. Riccardo must check the power supply and obtain Giorgio’s signature by 3 pm. Elena can connect and test the screen once the fittings are in place and the signed result is in.
Giorgio signed access record FM-001-LOG. Electrical check FM-001-08 is open in site report FM-001-SIT. The delivery note, FM-001-DDT, and installation record, FM-001-MON, are still drafts.
From joint inspection to the brand’s signature
After installation, Elisa will draw up a snag list at Wednesday’s preliminary inspection. The joint inspection with Marta and Giorgio is scheduled for Thursday at 3 pm and also requires Elena’s display test result. The team will give each outstanding item an owner and a deadline. Once the inspection is complete, Marta can sign for the store at the planned 4 pm handover, ahead of Friday’s opening.
The inspection record, FM-001-COL, and handover record, FM-001-HND, are drafts. Both milestones still depend on the display test.
After handover · Proposed extension
If the brand reported a fault after opening, how would the service team find the drawing for the wall actually installed? One possible next step is for Elisa to pass on the as-installed configuration, manuals, signed handover record, contacts and snag list with owners and deadlines. Simone Villa could then trace a report to the relevant fitting.
The FM-001 plan ends at handover to the brand. Simone taking over the case is a proposed extension.