Skip to content
Italiano

Before collecting the shaft

The inspection report has the old revision on it

“Yuna’s report still showed the old revision. And the shaft diameter was the very thing that had changed between the two drawings.” Nadia (Purchasing manager) catches it before she sets off, by asking for a comparison straight from the order in JARVIS.

Nadia compares the shaft drawing and the report on her monitor, with her hands on the keyboard and a speakerphone beside the screen.
Nadia checks the inspection report against the drawing.

Which drawing did you use to check the shaft?

On Thursday the shaft is ready for collection. Nadia asks an external agent authorised to read the order documents to compare them.

  1. Nadia, before collection

    “I already had the order open. I asked the agent right there, ‘Can you check Yuna’s report before I go and pick up the shaft?’ It showed me the drawing on the order alongside the report. The part number was right, but the report had the old revision on it. The change between revisions was the diameter they had to finish on the lathe.”

  2. A call to Yuna

    “I rang her. ‘Yuna, the report still shows the old revision. Which drawing did you use for the check?’ She checked the measurement sheet. ‘The new one. I sent you the report from last time.’ When the right one came through, I checked the revision against the drawing attached to the order and told her I’d come and collect the shaft.”

  3. Piotr, at goods-in

    Once she’s confirmed collection, Nadia asks the agent to prepare the receiving record for Piotr (Materials handler). The agent links the order and the right report and adds the bench listed in the assembly plan. “When Nadia got back, the record already told me where the shaft was going: the conveyor assembly bench. I checked the number on the part, put it on the trolley and took it over.”

From the NovaMotion story

From the lathe to the assembly bench

NadiaYunaChecking the report before collection

Yuna checks the measurement sheet and sends Nadia the correct report. Nadia checks the revision against the drawing attached to the order before collecting the shaft.

NadiaArunConfirming when the part is needed

Arun has already confirmed that the crew needs the shaft by noon to fit it on Friday afternoon.

PiotrNadiaThe receiving record for Piotr

Nadia has the receiving record prepared with the correct report and destination bench. Piotr checks the part number and takes the shaft to assembly.

What purchasing and stores can see on the job

For this assignment, an external agent connected to JARVIS through MCP or an API could work with authorised access to the order line, the released drawing, the reports Nadia has received and the assembly task. It could show her how the documents compare and link to each one. The supplier carries out the inspection.

  1. Revised drawing

    The revised drawing changes the shaft diameter to be finished on the lathe.

  2. Lathe pass

    Yuna books the lathe for Thursday.

  3. Dimensional check

    The report cites the old revision. Nadia rings Yuna to find out which drawing the supplier used to check the shaft.

  4. Assembly

    The crew prepares the frame in the morning. They need the shaft by noon to fit it on Friday afternoon.

When the shaft reaches stores

A possible next handoff, based on the purchasing and logistics roles.

Piotr could record the part number and quantity received against the order line on his task. Nadia could then see whether the delivery matches her order.

Back to Nadia’s story →