Before collecting the shaft
The inspection report has the old revision on it
“The part number was right. But the inspection report had the old revision on it, and the diameter they had to finish on the lathe was the very thing that had changed.” Nadia (Purchasing manager) spots it before setting off. With the purchase order open in JARVIS, she’s asked an external agent to compare the supplier’s report with the drawing attached to the order.
Yuna (Supplier technical contact) had booked the lathe for Thursday. Arun (Production planner) had already told Nadia the crew needed the shaft by noon on Friday. “So I rang Yuna. ‘The report still shows the old revision. Which drawing did you use to check the shaft?’ She looked at the measurement sheet and said, ‘The new one. I sent you the report from last time.’ I waited for the right one, checked the revision against the drawing attached to the order and went to collect the shaft.”
Nadia asks the agent to add the right report and the destination bench to Piotr’s receiving record. Piotr (Materials handler) recalls, “When the shaft came in, the record already said where to take it. I checked the part number and took it straight to the conveyor assembly bench.”




Andrea
Arun
Davide
Elena
Eva
Inês
Irene
Marta
Mikkel
Nadia
Nora
Piotr
Rafael
Sami
Sara
Team
Teo
Yuna