Between engineering and the shop floor
Which drawing should Sami use for assembly?
“I had the drive ready to fit and a printout on the bench. Before I tightened the bolts I wanted to know I had the right drawing.” Sami (Mechanical fitter)

From the NovaMotion story
From engineering to Sami’s bench
Elena
SamiChoosing the drawing for assembly
Elena releases revision 03 in PLM. Once the workshop gets the notification, Sami opens the drawing from his task and checks the conveyor number and revision.
The drawing Sami opens at the bench
“I finished my check and released revision 03 in PLM,” says Elena (Head of engineering). For this job, a rule in JARVIS links the drawing to the conveyor assembly task and notifies the workshop. “The notification came through while I was getting the drive ready. I opened the drawing from my assembly task,” says Sami. “The conveyor number matched the one in front of me. The title block said revision 03, the one Elena had just released. That’s the drawing I used to bolt the drive on.”
Elena’s drawing check
Elena checks the conveyor drawing and releases revision 03 in PLM.
The drawing on the assembly task
On release, the rule links revision 03 to the assembly task for that conveyor.
The workshop notification
The notification comes through while Sami is getting the drive ready. He opens the drawing straight from his task.
The check before fitting
Sami matches the conveyor number to the one on the drawing and reads the revision. Then he fits the drive to the frame using revision 03.
If the part number were hard to read
A possible follow-up with the warehouse.
The drawing tells Sami what to fit. If he couldn’t identify the part on his bench, he could check with Piotr, who put the kit together in the warehouse, before bolting it on.
Piotr Nowak